We visited site today to review the progress of our Phase One extension design. Significant progress is being made, with the blockwork well underway, rooflights being installed and the steels incorporated in line with our drawings and the engineer’s specified positions. The building shown on site when finished will explore a trapezium based geometry beneath a gable roof, allowing the external brickwork façade to continue seamlessly throughout, where internally it will be a snug, WC and bedroom for the client.
